May 30: EGRIP dome now on the surface. Traverse did a shallow drilling at WP060 and continued on.
Big changes at EGRIP today. We successfully pulled the dome up a ramp to the surface. It now sits 100 m from the original spot. At the same time, we…
Comments Off on May 30: EGRIP dome now on the surface. Traverse did a shallow drilling at WP060 and continued on.
May 30, 2025