June 21:”Greenland National Day and a stuck drill”

Today a first attempt of reaming the borehole casing was made with a concrete cutting bit and two antitorque sections to lower slipping in the casing. The reamer went down to about 32 m depth, but on the way up it was caught by a fiberglass edge that would not let the cutting bit pass. The drill therefore spent the night at 15 m depth in the borehole. The battery Viessman construction progressed well and the PFAS team went out to start drilling and sampling. Because of the arrival of many new field participants last Friday, we shifted the weekend one day so that our traditional Saturday night dinner was held Sunday evening. That also allowed us to celebrate the Greenland National Day. For the Sunday night dinner Sune prepared a Mediterranean-inspired pork cheek stew served with croquettes, homemade bread and vegetables of the season, which was followed by Pia’s lovely rhubarb pie. We had a cozy evening despite the critical situation in the drill tent.

 

What we did this Sunday:

  1. 1st attempt of reaming borehole casing
  2. Main generator oil filter check
  3. Cleaning cooks freezer entrance
  4. Placed all solar batteries in Viessman on sledge
  5. Initiated Covax PFAS drilling depth to 2.5 m depth
  6. Celebrated Saturday night on a Sunday

 

Ad. 5: PFAS site location: Lat 72.493833 Lon -37.334654

 

Weather: Overcast all day. Temp. from -16C to -12C. Wind 4-16 kts mostly from W.

 

FL, Anders Svensson

The drillers discussing and evaluating the footage from the downhole camera. As the picture reveals, there are very mixed feelings.
Jørgen and Carsten in front of the newly assembled Viessman battery cabin.